INFRASTRUCTURE
PLATAMONAS- LEPTOKARIA RAILWAY TUNNEL
Infrastructure
Completed
Tunnels
GREECE
Construction of a two direction railway line in a length of 11.35km. The works include the construction of 2,555m length tunnel, section 82m2, Cut & Cover 1,755 m and the necessary access roads 12 km, as well as drainage works.

* In joint venture