INFRASTRUCTURE
EGNATIA ODOS (SECTIONS)
Infrastructure
Completed
Road Construction - Motorways
GREECE

EGNATIA ODOS - Sections I/C Lagada - I/C Lachana and Stimoniko-I/C Christou


Construction of the sections “I/C Lagada – I/C Lachana” and “Strimoniko – I/C Christou” of the vertical road axis “Derveni – Serres - Promachonas” (axis 60), which is part of the European Axis IV.

The project mainly involves the construction of the highway of 22 km total length, with three (3) lanes per direction, including also one emergency lane and central island, the construction of five Interchanges and three level-junctions and the construction of the side and vertical road network, 71km in total. The contract also includes the construction of major and minor structure works alongside the main construction site.