INFRASTRUCTURE
ATTIKO METRO - EXTENSION OF LINE 2
Infrastructure
Completed
Tunnels
GREECE
Construction of a tunnel for the Athens Metro from Sepolia station to Thivon station. 2.700m of the tunnel have been constructed with open shield equipment (OFS) and 917m with NATM.

* In joint venture