ENERGY
SMALL HYDROELECTRIC PLANT ELEOUSA
Energy
Completed
Hydraulic
GREECE
The project is located on the right abutment of Axios river by the side of an existing irrigation dam, which belongs to the Ministry of Public Works by TERNA S.A for Public Power Corporation Renewabels - TERNA ENERGY S.A. The project began in 2005 and was completed in 2008.  The small hydro plant, exploits the large discharge of Axios, under a short energy head created by the dam. The main structures of the project are: The fore bay and the power house, located at the right river bank, the tail raise channel and the powerhouse that hosts two (2) Kaplan  PIT-Type units, housed in the powerhouse.

Average annual production: 30GWh