ENERGY
CONVERTER STATIONS OF THE CRETE – ATTICA INTERCONNECTION
Energy
Under Construction
GREECE
The Siemens – TERNA joint venture, has been awarded the contract for the “Engineering, Procurement and Installation of two Converter Stations and one Substation for the Direct Current Electrical Interconnection between Crete and Attica ” by Ariadne Interconnection, a subsidiary of the Independent Power Transmission Operator (IPTO).
According to the contract, there will be a 36-month construction period.